Difference between revisions of "Primary Crushers"

From SolidsWiki
Jump to navigation Jump to search
 
Line 6: Line 6:
* Please start editing this page after the /noinclude   
* Please start editing this page after the /noinclude   
* -------------------------------------------------></noinclude>  
* -------------------------------------------------></noinclude>  
[[File:Primary_stage.jpg | thumb | right | Primary Crushing work ]]
[[File:Primary_stage.jpg | thumb | right | Primary Crushing work ]]
'''Primary  Stage Crushing''' is the first stage in the [[Crushers | crushing]]  cycle. It`s the first process where large material is being reduced in  size by crushing it in too smaller particles required by customers.  Primary and [[Secondary Stage Crushers]] handling coarse materials,  where [[tertiary Stage Crushers]] grinds them after those.
'''Primary  Stage Crushing''' is the first stage in the [[Crushers | crushing]]  cycle. It`s the first process where large material is being reduced in  size by crushing it in too smaller particles required by customers.  Primary and [[Secondary Stage Crushers]] handling coarse materials,  where [[tertiary Stage Crushers]] grinds them after those.
Generally speaking, The primary Crusher machine is often the largest and most expensive single item in the plant.  
Generally speaking, The primary Crusher machine is often the largest and most expensive single item in the plant.  
Line 16: Line 12:


Rocks  up to 5 feet by 4 feet by 4 feet in size enter the primary crusher  which reduces the size to 12 inches or smaller. Water is sprayed to  reduce dust.
Rocks  up to 5 feet by 4 feet by 4 feet in size enter the primary crusher  which reduces the size to 12 inches or smaller. Water is sprayed to  reduce dust.


For soft Feed [[Horizontal Impact Crushers | Horizontal Impact  Crusher]] is normally used in the primary stage, for harder feed there  is a choice between a [[Gyratory Crushers | Gyratory Crusher ]]
For soft Feed [[Horizontal Impact Crushers | Horizontal Impact  Crusher]] is normally used in the primary stage, for harder feed there  is a choice between a [[Gyratory Crushers | Gyratory Crusher ]]

Latest revision as of 21:16, 2 September 2012


Primary Crushing work

Primary Stage Crushing is the first stage in the crushing cycle. It`s the first process where large material is being reduced in size by crushing it in too smaller particles required by customers. Primary and Secondary Stage Crushers handling coarse materials, where tertiary Stage Crushers grinds them after those. Generally speaking, The primary Crusher machine is often the largest and most expensive single item in the plant.


Rocks up to 5 feet by 4 feet by 4 feet in size enter the primary crusher which reduces the size to 12 inches or smaller. Water is sprayed to reduce dust.

For soft Feed Horizontal Impact Crusher is normally used in the primary stage, for harder feed there is a choice between a Gyratory Crusher


Stages