♠ Elimination of additional water usage from the condensing power cycle | ♠ Elimination of additional water usage from the condensing power cycle | ||
♠ Flexibility in power plant site selection | ♠ Flexibility in power plant site selection | ||
♠ Decreased time required for plant permitting | ♠ Decreased time required for plant permitting. | ||
[[File:Air Cooled Condenser.jpg]] | [[File:Air Cooled Condenser.jpg]] | ||
The typical scope for an ACC installation includes the supporting structure, the steam ducting from the steam turbine interface, auxiliaries such as the condensate and drain pumps, condensate and duct drain tanks, the air evacuation units and related piping works and instrumentation. | |||